background image

 

CONTENTS

DISCLAIMER

INTRODUCTION
This Installation manual for WireGuide Skylight has been produced by Rollease Acmeda to supply the necessary information for the safe and correct installation of 
WireGuide Skylight.

DISCLAIMER
Rollease Acmeda has used reasonable care in preparing the information included in this document, but makes no representations or warranties as to the 
completeness or accuracy of the information. Information is supplied upon the condition that the persons receiving the information will make their own 
determination as to its suitability for their purposes prior to use. Rollease Acmeda assumes no liability whatsoever for any damages incurred by you resulting from 
errors in or omissions from the information included herein. Rollease Acmeda reserves the right to make changes without further notice to any products to improve 
reliability, function or design.

COPYRIGHT
COPYRIGHT © ROLLEASE ACMEDA
All rights are reserved. No part of this document may be reproduced or utilised in any means, by any means, electronic or mechanical including photocopying, 
recordings, or by any information storage or retrieval system, without the express permission from Rollease Acmeda.

SECTION A: 

| ITEMS REQUIRED 

 01

ASSEMBLED PARTS 

 �����������������������������������������������������������������������������������������������������������������������������������01

SECTION B: 

| INSTALLATION 

 02

INSTALL BOX & GUIDE WIRE 

 ����������������������������������������������������������������������������������������������������������������������02

INSTALL FABRIC/SPRING TUBE INTO BOX 

 �������������������������������������������������������������������������������������������03

WIREGUIDE | 60MM TUBE PRE-TENSION CHART   �������������������������������������������������������������������������������������������04
WIREGUIDE | 80MM TUBE PRE-TENSION CHART   �������������������������������������������������������������������������������������������05
INSTALL MOTOR/SPOOL TUBE INTO BOX  ���������������������������������������������������������������������������������������������������������06
INSTALL SPOOL CORD   �����������������������������������������������������������������������������������������������������������������������������������07
FUNCTION CHECK 

 �����������������������������������������������������������������������������������������������������������������������������������08

INSTALL BOX COVERS 

 �����������������������������������������������������������������������������������������������������������������������������������08

Summary of Contents for WireGuide Skylight

Page 1: ...November 2018 WIREGUIDE SKYLIGHT INSTALLATION MANUAL...

Page 2: ...mages incurred by you resulting from errors in or omissions from the information included herein Rollease Acmeda reserves the right to make changes without further notice to any products to improve re...

Page 3: ...stallation Manual November 2018 2018 Copyright All Rights Reserved Rollease Acmeda ASSEMBLED PARTS SECTION A ITEMS REQUIRED 1 2 3 4 5 1 Spring Fabric Box 2 Motor Spool Box 3 Spring Fabric Tube 4 Motor...

Page 4: ...CRIMP THE WIRE TO THE DOMED TERMINAL STEP 3 INSERT WIRE WITH SPRING INTO L BRACKET STEP 4 PULL TIGHT MARK WIRE STEP 5 INSERT WIRE INTO BOLT CRIMP SECTION B INSTALLATION STEP 6 ASSEMBLE TIGHTEN NOTE T...

Page 5: ...FER TO PRE TENSION CHARTS FOR PRE TURNS REQUIRED SEE FOLLOWING PAGES Rollease Acmeda does not recommend exceeding suggested pre turn values SECTION B INSTALLATION Pre Turn Spanner available through Ro...

Page 6: ...7 17 18 18 18 18 18 18 17 17 17 17 17 17 4 17 17 17 17 17 17 17 16 16 16 16 16 16 16 1 40 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 15 15 5 1 60 15 15 15 15 15 15 16 16 15 15 15 15 15 15 15 1...

Page 7: ...18 18 18 18 18 18 18 18 18 18 1 20 18 18 18 19 19 19 19 19 19 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 1 40 18 18 18 18 18 18 17 17 17 17 17 17 17 17 17 17 17 17 17 5 1 60 17 17 17...

Page 8: ...nual November 2018 2018 Copyright All Rights Reserved Rollease Acmeda INSTALL MOTOR SPOOL TUBE INTO BOX STEP 1 INSTALL MOTOR HEAD ONTO MOTOR BRACKET SECTION B INSTALLATION STEP 2 SWING IDLER END INTO...

Page 9: ...Rollease Acmeda INSTALL SPOOL CORD STEP 1 UNLOCK PRE TENSION IDLER SECTION B INSTALLATION LEFT HAND SPRING UN LOCKED NOTE TAKE DOWN TUBE IF PRE TURNS NEED TO BE ADDED REMOVED R PULL WEIGHT BAR OUT CH...

Page 10: ...EP 1 TEST OPERATION OF SKYLIGHT STEP 2 IF NO CHANGES ARE REQUIRED ASSEMBLE WEIGHT BAR END CAPS STEP 1 SWING BOX COVERS INTO PLACE FUNCTION CHECK INSTALL BOX COVERS SECTION B INSTALLATION STEP 2 FIX IN...