Connect the appliance to the gas supply pipe, interposing a stop valve which enables
the appliance to be insulated from the rest of the installation.
Check the supply pressure using a manometer when all the burners are lit. It must be
equal to the indications on the rating plate.
The fresh air flow required for combustion air supply is:
-
PSR 400 G
6.4 m3/h
-
PSR 600 G
12.8 m3/h
-
PSR 900 G 19.2 m3/h
General conditions of installation
The installation and maintenance of the appliance must be carried out in compliance
with the statutory texts and good practices in force, mainly:
General specifications
For all appliances:
Article GZ
Installation with combustible gases and liquefied hydrocarbons.
Then, according to use:
Article CH
Heating, ventilation, refrigeration
Air conditioning and domestic hot water steam generation.
Article GC
Installation of appliances to be used for catering
Specific provisions for each type of establishment to which the public is admitted
(hospitals, shops, etcN)
Important: Never change the diameter of the injectors.
17
Summary of Contents for PSR 400 G
Page 2: ......
Page 3: ......
Page 22: ...22 Nomenclature PSR 400 G Spare parts PSR 400 G...
Page 23: ...23...
Page 24: ...24 Nomenclature PSR 600 G Spare parts PSR 600 G...
Page 25: ...25...
Page 26: ...Nomenclature PSR 900 G Spare parts PSR 900 G 26...
Page 27: ...27...
Page 28: ...G03232...