Part No 4801-5162 Rev 09-2019
RS-500/600 M Series Doors
Page 26
11.1
Tools Required
3/8 in. (10 mm) Power screwdriver (portable)
3/16 in. (5 mm) Drill bit and power drill
Socket
Hammer
Tape measure
Carpenter's level
NOTE: Other Tools May Be Required According To Installation.
11.2
Overview
The RS-500/600 Door with CMS is shipped with pre-assembled vertical members (left track and right tracks),
with floating magnets, and a pre-assembled horizontal member (head unit). When components are received,
check for damaged, loose or missing parts. If there are damaged or missing parts contact your RollSeal
distributor immediately. Please read and understand all instructions in this manual before beginning installation.
After the door has been assembled and attached to the door framing per instructions in
manual it is necessary to install the Condensation Management System (CMS) and ducts to complete the freezer
door installation.
12
Installation of Condensation
Management System (CMS) and Ducts
Install the Condensation Management
System at the top of the Freezer Door
approximately in the center of the door as
shown below. Install the 5/7” Duct Adaptor
in the intake side of the Condensation
Management System.
Carefully run the duct work to the two
couplings on the left and right track of the
door. Fasten each end of the duct with hose
Clamps.
NSF Certified Doors are equipped
with Left mount Brother operators,
Smart Controller, and Magnetic
Track Sealing System