background image

VITREOUS CHINA VANITY TOP

REV. 160801

PRODUCT INSTALLATION

2

A RONBOW COMPANY

INSTALLATION

1

Vanity top preparation

 

Install the faucet into the pre-drilled locations of the 

vanity top (Faucet and Drain not included).

 

Follow the manufactures installation instructions to 

install the faucet and drain.

 

Do not over tighten the faucet system to avoid 

unnecessary damage to the vanity top.

2

Vanity preparation

 

The vanity should be set in place per the 

manufactures installation instructions (Vanity not 

included).

 

Use a light damp cloth to wipe any dirt or dust from 

the top edge of the vanity.

Reviews: