Transport and Storage
Page 12
RES-5008
Version 2
6
Transport and Storage
6.1
Scope of Delivery
After taking delivery, check if the delivery is complete immediately, with the help of the accompanying documents.
After taking delivery, perform a visual inspection for possible damage.
6.2
Transport and Storage
Transport and store the device in its original box. For the ambient conditions, please refer to the technical data
(
section 13 "Technical data" on page 57). After a longer period of storage of the RESISTRON
®
Temperature
Controller RES-5008, ROPEX Industrie-Elektronik GmbH will handle the functionality testing for a fee.
7
Mounting and Installation
See also section 4 "Requirements for the functioning of the control system" on page 8.
7.1
Installation sequence
Proceed as follows during mounting and installation of the RESISTRON
®
Temperature Controller RES-5008:
1. Switch off mains voltage and 24 VDC power supply; verify lack of voltage.
2. Installation of the RESISTRON
®
Temperature Controller in the switching cabinet on a TS35 top-hat rail in
accordance with EN 60715. If several devices are mounted, the minimum distance specified in section 12
"Disposal" on page 56 must be maintained.
3. Installation of the operator terminal in the panel cut-out. It is fastened with four clips that snap into place laterally
at the terminal housing.
NOTE
ROPEX Industrie-Elektronik GmbH does not assume any guarantee for defects that are sub-
sequently claimed.
WARNING
The assembly, installation and commissioning may be performed only by technically trained
and competent persons. The persons must be familiar with the dangers associated with it and
guarantee provisions.
CAUTION
The supply voltage to the machine side must lie within the permitted voltage and frequency
range of the temperature controller. Otherwise, there is the danger of a defect.