35 Congress Street, Salem, MA 01970
Tel# 1- 800 631-9707 Fax# 1-800-560-2890
e-mail:signware@rosedisplays.com
Parts
Instruction Sheet
Step 1
Insert corner brackets into split rails
and into rail opposite split rail. Split
rail side is made up of two separate
pieces.
Fig. 1
Note:
Corner bracket tension tabs
must face toward inside of frame.
Step 2
Finish assembling frame as shown in
Fig. 2
by sliding sides together in the
order shown.
Step 3
Insert hangers into upper portion of
slatwall. Hangers will rest on lower
portion of slatwall.
Fig. 3
Note:
To ensure that the frame hangs
level use two hangers placed an equal
distance in from each side of the frame.
Step 4
Place the EconoFrame on the hangers
using the bottom channel of the top
Econo rail.
Fig. 4
Step 5
Insert poster.
Fig 5
Instructions for Hanging
Incept-3.6.02
The EconoFrame™ is a trademark of Rose Displays, Ltd. Neither the
manufacturer nor any sales agent may be held liable for injury, loss or
damage resulting from the use of these products.
Part #02INSEconoFrameSlatwall
EconoFrame
Rails 12EF-100
EconoFrame
Split Rails
Corner
Brackets
EconoFrame
TM
Figure 1
Figure 5
Figure 2
split rails
Figure 3
Figure 4
Slatwall
Hangers
06-6068
solid rail
solid rail
split rails