background image

1

Lay out the base components prior to assembling as shown (be sure that the upright assembly bosses 

are facing upward). Use the two rectangular tubes to connect the base sides. Press joints together 

firmly to ensure connectors engage the tubing.

Signware

AnoFrame Top Load

MultiStand 

35 Congress Street, Salem, MA 01970   |   800.631.9707   |  www.rosedisplays.com   |   signware@rosedisplays.com

AnoFrame™ is a trademark of Rose Displays, Ltd. Neither the manufacturer nor any sales   

agent may be held liable for injury, loss or damage resulting from the use of these products.

2 Full Rails

12AF100RT-B

A

2 Split Rails

12-0200-B

B

C

D

E

F

G

1 Short 

Rail

2 long base connec-

tors

2 Base Sides 

1 Right PN#

1 Left PN#

4 Casters

PN#

4 Pairs Brackets

PN#

Caution

Sharp 

Corners!

(Up)

(Up)

F

F

E

E

P1

Completed base

(2) Bosses face 

upward

(4)Threaded 

corners face 

floor

Part Layout

Reviews: