750ml Waterfall Right
4
Step 3
Attaching
FRONT
ladders.
Nail the cross pieces under the 5th, 9th and 10th cleat starting
from the bottom. Nail first top cross piece that is facing
upwards as shown. Nail rest five front top cross pieces flush
with top of the ladders as shown.
baseboard attached
to bottom of rack
1
4
3
Crown moulding
attached to top of rack
1
2
1
Face this top cross piece upwards
Step 4
Attaching to the wall
Fasten to the wall through the back cross pieces using #8x3 “ screws and
using a level to make sure rack is mounted square on the wall. Make sure
back cross piece has ” dia pilot holes drilled before screwing to wall.
For a professional looking job you can use a nail set to indent the nail
heads and wood filler to fill in the nail holes on the front cross pieces, base-
board and crown moulding. Give the part that was filled a light sanding
with 180 grit sandpaper.
3
32
Apr/23/2012
Toll Free: 1-888-253-6807
www.RosehillWineCellars.com
6ft Premier Cru
Kit Rack