background image

750ml Waterfall Right

4

Step 3

Attaching 

FRONT

 ladders.

Nail the cross pieces under the 5th, 9th and 10th cleat starting 

from  the  bottom.  Nail  first  top  cross  piece  that  is  facing 

upwards as shown. Nail rest five front top cross pieces  flush 

with top of the ladders as shown.

 

 

baseboard attached 

to bottom of rack

 

1

4

  3

 

 

Crown moulding 

attached to top of rack

 

1

2

  1

Face this top cross piece upwards 

Step 4

Attaching to the wall

Fasten to the wall through the back cross pieces using #8x3 “ screws and 

using a level to make sure rack is mounted square on the wall. Make sure 

back cross piece has    ” dia pilot holes drilled before screwing to wall.

For a professional looking  job you can use a nail set to indent the nail 

heads and wood filler to fill in the nail holes on the front cross pieces, base-

board and crown moulding. Give the part that was filled a light sanding 

with 180 grit sandpaper.

3

32

Apr/23/2012

Toll Free: 1-888-253-6807 

www.RosehillWineCellars.com

6ft Premier Cru

Kit Rack

Summary of Contents for Premier Cru Waterfall Right CRU6 WATERRIGHT

Page 1: ...nt units have been ordered please assemble all boxes by units to ensure that specific unit parts are not intermixed with other units 3 It is highly recommended to drill dia pilot holes on back cross pieces for screws before attaching to wall 3 32 8x3 Assembly Instructions 6Ft Tools Needed Hammer Pneumatic Brad Nailer Power drill Level Power miter saw Preferred pilot drill Nail Set Wood filler Opti...

Page 2: ... Middle ladder 1pc Middle ladder 1pc Middle ladder 1pc Middle ladder 1pc Middle ladder 1pc Right end ladder Crown 10 pcs Cross piece 2 pcs Cross piece 7pcs Cross piece Baseboard Apr 23 2012 Toll Free 1 888 253 6807 www RosehillWineCellars com 6ft Premier Cru Kit Rack ...

Page 3: ...piece flush with top of the ladders Top of Rack 1st Cleat 5th Cleat 9th Cleat 10th Cleat Step 2 Attaching middle ladders Take the middle ladders making sure the angled cleats are facing front Place each ladder into cross piece slots and nail from the back on all five back cross pieces First cleat is located from the bottom of the ladder 1 4 3 Angled cleats facing front Apr 23 2012 Toll Free 1 888 ...

Page 4: ...pwards Step 4 Attaching to the wall Fasten to the wall through the back cross pieces using 8x3 screws and using a level to make sure rack is mounted square on the wall Make sure back cross piece has dia pilot holes drilled before screwing to wall For a professional looking job you can use a nail set to indent the nail heads and wood filler to fill in the nail holes on the front cross pieces base b...

Reviews: