Page - 64 -
© 2014
SLF 2250/4000
Hydromatic Stinger
ATTENTION !
Bring the nozzle to a upright position before activating or parking
the boom or use the automatic levelling function.
This is to prevent the cabin and/or the turret from damage caused
by the sweeping down nozzle.
CAUTION !
Do not enter the roof whiles operation the stinger !
Before activating the turret control please make sure to have
enough operation area available.
Stinger and Stinger Turret Operation
Stinger and Stinger Turret Operation
- Engage the P.T.O. for hydraulic oil pump:
◊
Please refer to the "Engaging the Hydraulic Oil Pump".
ATTENTION !
When activating a boom function and the water pump is not
engaged, the engine speed will increase to high idle. *
When the water pump is engaged the engine speed is to be
increased on the pump control panel or via the remote control.
Note:
The pilot lamp (H66) is installed at any hinged ladder of the
vehicle. This pilot lamp (H66) indicates activated stinger. Do not
enter the roof whiles operation the stinger !
- For further information please refer to the separate boom
operation manual.
CAUTION !
Minimum distance 1 m to overhead lines until 1 kV
Minimum distance to high-voltage line:
3 m 1 kV - 110 kV, 4 m 110 kV - 220 kV, 5 m 220 kV - 380 kV
Sight contact with the turret discharge is absolutely essential!
Never point the discharge jet at anybody.
DANGER OF INJURY TO PERSONNEL!
H66