Page - 70 -
© 2014
SLF 2250/4000
Hydromatic Stinger
Stinger and Stinger Turret Operation
Roof turret RM 65 C - operation with water or water/foam
Temporary stopping of turret operation:
- If open, close the foam compound pressure valve for turret line:
◊
Press switch (11) + (1) again.
- Close turret discharge valve:
◊
Press switch (10).
Stopping of turret operation:
- If open, close the foam compound pressure valve for turret line:
◊
Press switch (11) + (1) again.
- Disengage the roof turret and the pump:
◊
Let engine idle.
◊
Press switch (10).
◊
Press shift switch (11) + (10) to disengage the roof turret.
The turret moves to it's transport position.
◊
Disengage the pump - please refer to the "Engaging the
Pump" chapter.
- Disngage the remote control (U31):
◊
Press only switch (12) for 3 seconds.
◊
The remote control is disengaged.
For further information please refer to the separate operation
manual.
10
12
9
11
U31
ATTENTION !
On designs without a turret pipe, AFFF foam compound should be
used, otherwise the foam quality is poor !
The pump system must be flushed after every foam operation.
Please refer to the "Flushing after Foam Operation" chapter.
1