41
9. Tighten the bolts,(A), with a tightening torque of 80 Nm.
10.Re-connect all the pipes to the respective fittings.
11.Start up the machine ensuring there is no leakage between the cap and the tank.
12.Allow the machine to operate for 10-15 minutes with closed cocks
13.Stop the machine with tank depressurized to 0 bar, re-check the screw tightening (A).
Abb. 21
Summary of Contents for MDVN 71 AP
Page 2: ...2...