Starting up
22
6
Starting up
6.1
Basic safety instructions
Prior to the initial commissioning, a safety inspection must be performed by a
qualified and authorised person. This person must confirm and document the
technically flawless functioning of the machine.
In Germany, inspection according to GUV-G 945 must be carried out. For this,
use the inspection log book in the appendix of this operating manual.
The following is to be checked:
•
correct installation
•
proper functioning of safety devices
•
operational readiness
6.2
Initial commissioning
Prior to initial commissioning
X
Inspect the machine for visible signs of damage.
If damage is detected:
X
Do not switch on the machine.
X
Attach or erect a notice sign prohibiting switching on the machine.
X
Notify your supervisor of the detected damage.
X
Only use the machine if all damage has been repaired.
X
Remove any foreign objects from the danger zone (
).
X
Remove materials and objects from the work area if they are not required.
X
Check and ensure that all safety devices are functioning flawlessly.
The preparations are completed.
Before starting the machine, check and ensure the following:
•
Only authorised persons are in the work area of the machine.
•
No one will be endangered by the starting up of the machine.
•
Measures have been taken to prevent unintended changes in the position of
the load.
•
A clear view is available of the load, the machine and particularly the danger
zone (
).
•
Avenues of escape are available in the event of danger.
Starting
X
Turn the main switch to "1"
X
Press the «Lift» control
Check the following after the first startup:
X
All hydraulic hoses for airtightness.
Summary of Contents for ML40
Page 2: ......
Page 43: ...Appendix 41 11 Appendix...
Page 44: ...Appendix 42 Mechanical components...
Page 46: ...Appendix 44 Mechanical components...
Page 91: ......