Maintenance and inspections
37
Performing the inspection
X
Copy the inspection list (
Chap. 9.6.3 "Inspection list", page 38
).
X
Inspect every item and check it off if OK.
X
Only put the machine back into operation if all points have been checked off.
X
After completing the inspection, file the inspection list behind the appendix in
this operating manual.
The inspection is completed.
9.6.2
Additional inspections
Additional inspections of the machine are to be performed by a qualified and au-
thorised specialist after each servicing and every repair of a malfunction.
An additional inspection is likewise required if the machine is to be restarted after
being temporarily put out of service.
In Germany, inspection according to GUV-G 945 must be carried out. For this,
use the inspection log book in the appendix of this operating manual.
Performing the inspection
X
Copy the inspection list (
Chap. 9.6.3 "Inspection list", page 38
).
X
Inspect every item and check it off if OK.
X
Only put the machine back into operation if all points have been checked off.
X
After completing the inspection, file the inspection list behind the appendix in
this operating manual.
The inspection is completed.
Summary of Contents for ML40
Page 2: ......
Page 43: ...Appendix 41 11 Appendix...
Page 44: ...Appendix 42 Mechanical components...
Page 46: ...Appendix 44 Mechanical components...
Page 91: ......