background image

 

23 

 
 

FIG. 5 CONTROL BOX 

 

Nr. 

CODE 

DESCRIPTION 

QUANTITY

 

06-6012 

FINISHING ELEMENTS 

06-6055 

MAIN SWITCH 

01-1618 

CABINET 

06-1003 

TOUCHPAD 

01-1622 

DOOR 

06-6126 

THREE PHASE MOTOR 

10 

04-4587 

PUMP  

11 

04-4024 

OIL CAP 

12 

01-1610 

OIL TANK 

13 

04-4600 

HAND PUMP/ELECTROVALVE BLOCK 

14 

06-0335 

FULL ELECTRIC CARD 

17 

01-1611 

TANK COVER 

18 

01-1624 

CONSOLLE 

19 

01-1625 

CONSOLLE COVER  

20 

04-4586 

L270 T1 PVC PIPE  

21 

04-4584 

P1 FLEX R2TFG3/8 PIPE 

23 

02-2200 

MOTOR FLANGE 

24 

04-4585 

L170 PVC PIPE 

25 

04-4104 

SUCTION FILTER 

26 

03-3086 

M8X30 TCEI BOLT 

27 

03-3084 

M6X25 TCEI BOLT 

28 

03-3085 

M8X16 TCEI BOLT 

29 

03-3080 

M8X12 TCEI BOLT 

30 

03-3123 

M8X16 TE BOLT 

31 

03-3456 

WASHER 

32 

03-3085 

M8X16 TCEI BOLT 

33 

04-4598 

ACCOUPLEMENT JOINT 

34 

05-5000 

AIR ELECTROVALVE 

35 

05-4040 

AIR FILTER 

36 

05-5512 

90° 1/8 x ø 6 UNION ELBOW 

37 

05-5514 

AIR ELECTROVALVE CONNECTOR 

 

FIG. 6 ELECTRIC COMPONENTS 

06-6123 

FUSE CARRIER 

06-6534 

TRANSFORMER 70VA 

06-6125 

CONTACTOR 

06-6124 

FUSE CARRIER 

06-6151 

CONNECTOR 

06-6150 

CONNECTOR 

06-6127 

DIN GUIDE 

06-0335 

ELECTRIC CARD 

06-0002 

FUSE-1A 10X38 

06-6537 

FUSE- 20A 

 

FIG. 7 SAFETY ELEMENTS

 

06-0302 

PROXIMITY SWITCH  

01-2220 

CLAMP 

06-6692 

REFLECTOR 

02-2217 

PROXIMITY CAM ACTUATOR 

03-3071 

SPRING 18x2xL80 mm. 

01-2219 

PHOTOELECTRIC CELL CLAMP 

06-6607 

PHOTOELECTRIC CELL 

03-3079 

6X90 TCEI BOLT 

03-3078 

M6 SELF LOCKING NUT 

 

02-2221 

SPRING SUPPORT BUSHING  

 

FIG. 8 RAMPS

 

01-2247 

LOWERING RAMP 

01-2217 

 FRONT WHEEL TRIMMING 

01-2248 

LIFTING RAMP 

01-2218 

BLACK COVER 

01-2249 

BLACK COVER 

01-2216 

REAR WHEEL TRIMMING 

 

Summary of Contents for GLP99SM

Page 1: ...SCISSOR LIFT FREE WHEELS GEMINI LOW PROFILE OPERATING INSTRUCTIONS GLP99SM GLP99SM P...

Page 2: ...WITH THE FOLLOWING EUROPEAN DIRECTIVES 98 37 CEE 73 23CEE 93 68 CEE 89 336 IT ALSO DECLARES THAT THE FOLLOWING EUROPEAN RULES HAVE BEEN RESPECTED EN 292 1 EN 292 2 EN294 EN 349 EN 1050 EN 60204 1 ETS...

Page 3: ...N 291 1992 EN 292 1992 EN 294 EN349 EN1050 EN 60204 1 EN 300683 EN 55022B Only skilled and previously authorized technicians should be allowed to carry out transport assembling setting maintenance ove...

Page 4: ...sed versions They have been designed and built for car van lifting and placing operations Our car lifts are equipped as follows A BASE Fixed structure B BOOMS PLATFORM Lifting and travelling structure...

Page 5: ...be padlocked to prevent the use of the lift during the maintenance 1 position the lift is powered GLP99SM GLP99SMP double scissor car lifts are able to lift vehicles and van whose weight is no more t...

Page 6: ...he lift 4 Never use the lift without protection or when safety devices are off line 5 Always use the rubber pads when lifting a vehicle observing the proper points of support specified by the vehicle...

Page 7: ...LD BE ALLOWED TO INSTALL THE CAR LIFT SERIOUS DAMAGE TO PEOPLE OR EQUIPMENT CAN BE CAUSED IF THIS RULE IS NOT FOLLOWED The lift must be installed according to the specified safe distance from walls co...

Page 8: ...ctric card of the power unit WIRING CONNECTIONS POSITION N CODE DESCRIPTION 1 06 0302 Lifting limit switch 4 06 6607 Photoelectric cell 3 06 0302 P2 platform self levelling 5 06 0302 P1 platform self...

Page 9: ...9 WIRING DIAGRAMS...

Page 10: ...10 WIRING DIAGRAM...

Page 11: ...11 WIRING DIAGRAM...

Page 12: ...ORS K1 17 RELAIS D1 37 DIODS R1 44 RESISTORS DL LED SPRI BLEEPER S1 RESET TIMER BUTTON S2 TIMER REGULATOR IC4 TIMER MICROCHIP ICS BLEEPER MICROCHIP C1 24 CAPACITOR TR1 5 TRANSISTORS IC 1 2 3 5 VOLTAGE...

Page 13: ...4 3001 LEVELLING P2 DELIVERY C 04 3004 PIPE CONNECTION H P1 HYDRAULIC PLAN 1 PARACHUTE VALVE 6 3 5 L PUMP 2 LEVELLING ELECTRO VALVE EL 7 THREE PHASE MOTOR 4 HP 3 LOWERING ELECTRO VALVE EO 8 SUCTION FI...

Page 14: ...n power supply is disconnected to avoid the possibility of electrocution COMMERCIAL PARTS WIRING PLANT Position n Denomination Manufacturer Type Max Appl Proximity SIEMENS 10 30V DC pnp NC 0 3A Sn1 2m...

Page 15: ...tform so that they are in line with the lifting points specified by the manufacturer Press the lifting button keep it pressed until the required height is reached To lower the lift press the lowering...

Page 16: ...al capacity cannot be lifted Max pressure valve malfunction Suction filter malfunction Worn pump Contact service dept Clean the suction filter or contact service dept Replace the pump Platform out of...

Page 17: ...icated on chapter 3 and 6 when making the substitution of the spare parts and the repair intervals Spare parts ordering procedure When ordering spare parts the following must be clearly specified Car...

Page 18: ...18...

Page 19: ...19 FIG 3 LEVERS AND PISTON FIG 4 PLATFORM...

Page 20: ...20 FIG 5 CONTROL BOX...

Page 21: ...21 FIG 6 ELECTRIC COMPONENTS FIG 7 SAFETY ELEMENTS FIG 8 RAMPS...

Page 22: ...RICTION WASHER 16 17 02 2229 LOWER BOOM COUPLING PIN 4 18 03 3525 25x28x30 SELF LUBRICATIN BUSHING 24 19 02 2209 BOOM FASTENING PIN 8 20 01 2214 SLEIGHT 4 22 01 2215 NYLON SKATE 4 23 02 2224 HOSE SUPP...

Page 23: ...X16 TCEI BOLT 3 33 04 4598 ACCOUPLEMENT JOINT 1 34 05 5000 AIR ELECTROVALVE 1 35 05 4040 AIR FILTER 1 36 05 5512 90 1 8 x 6 UNION ELBOW 2 37 05 5514 AIR ELECTROVALVE CONNECTOR 1 FIG 6 ELECTRIC COMPONE...

Page 24: ...om walls columns ceiling other machines etc 3 Power supply line check 4 Lift levelling check 5 Lift working check 6 Hydraulic safeties working check 7 Electric safeties working check 8 Loaded lift che...

Page 25: ...t of visit Positive Negative Installer Stamp and signature User Stamp and signature Date Next test on RECURRING OR OCCASIONAL VISIT N DESCRIPTION OF TEST YES NO Notes 1 Lift maintenance and cleaning c...

Page 26: ...tic failure check 4 Safety devices working check MONTLY TESTS 1 Lift through cleaning 2 Rollers slides check 3 Cylinders air bleeding if necessary HALF YEARLY TESTS 1 Oil level check 2 High pressure f...

Page 27: ...Stamp and signature REPAIR FAILURE ACTION Date Stamp and signature October 2000 BY THE GRAPHIC DEPARTEMENT A R ROTARY LIFT EUROPE S r l Via Tiburtina Km209 800 65025 Manoppello Scalo PESCARA ITALY Te...

Reviews: