BRP-Rotax
INSTALLATION MANUAL
Figure 7.13
1
Shift contact
guidance
2
Retaining plate
Step
Procedure
5
Mount Allen screw (pos. 1), lock wash-
er (pos. 2) and spacer (pos. 3) togeth-
er with the shift contact guidance (pos.
4) to the engine housing. Tightening
torque 22 Nm.
Figure 7.14
1
Allen screw
2
Lock washer
3
Spacer
4
Shift contact guidance
Step
Procedure
6
The alignment between point -1- and
point -2- must be given. Otherwise it
can cause increased friction, which
has a negative impact on shifting
behavior.
Figure 7.15
1
Point 1
2
Point 2
Step
Procedure
7
Mount sleeve (pos. 1) onto the retain-
ing plate (pos. 2).
Figure 7.16
1
Mount sleeve
2
Retaining plate
Step
Procedure
8
Mount second Bowden cable (pos. 1)
through shift contact guidance and
sleeve onto the retaining plate (pos.
2).
No washer is necessary on this Bow-
den cable.
Page 8
Edition: September 01 2019
Effectivity: 125 MAX DD2 evo
Summary of Contents for 125 MAX DD2 evo
Page 2: ...General information BRP Rotax recommends products of the following companies...
Page 63: ...Operator s Manual...
Page 65: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 67: ...Page 2 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 73: ...Page 6 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 81: ...Page 8 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 113: ...Page 12 Edition September 01 2019 Effectivity 125 MAX DD2 evo NOTES BRP Rotax Operators Manual...
Page 119: ......