d0
453
0.
fm
MAINTENANCE MANUAL
BRP-Powertrain
Effectivity: 914 Series
Edition 2 / Rev. 0
12-20-00
page 40
January 01/2010
12.3) Pneumatic synchronization
General note
See
to
NOTES:
Perform a mechanical synchronization before attempting a
pneumatic synchronization.
Special tool
The two carburetors are adjusted to equal flow rate at idling with a suitable
flow meter or vacuum gauge(s).
Connection
Possible connection methods.
Graphic
Option 1
Fig. 19
08652
WARNUNG
WARNING
Danger of life threatening injuries caused by the pro-
peller, rotating and stressed parts of the engine!
Always observe the engine from a safe place while it is
running.
Option 1
Step
Procedure
1
Remove the compensating tube (2) from the push on angular tube (4) after re-
moving the two clamps (3).
2
Using the push on angular tube (4) and compensating tube (2) install a flexible
rubber hose (5) leading to the vacuum gauge (1).
Part
Function
1
Vacuum gauge
2
Compensations tube
3
Clamp
4
Angular tube
5
Rubber hose
4
3
5
1
4
2
3
5
Summary of Contents for 914 series
Page 183: ......