ENGLISH
18
Contens
Page
1
Introduction
20
2
Safety Instructions
20
2.1
Using the Correct Connection Terminal
20
2.2
Improper Use of the Welding and Power Supply Cables
20
2.3
Securing the Fitting and the Joint
20
2.4
Cleaning the Product
20
2.5
Opening the Unit
20
2.6
Extension Cables on the Worksite
20
2.7
Checking the Product for Damage
21
2.8
Data Interface Cover Cap
21
2.9
Power Supply Specifications
21
2.9.1 Mains Power Supply
21
2.9.2 Generator Power Supply
21
3
Service and Repair
21
3.1
General
21
3.2
Transport, Storage, Shipment
21
4
Principles of Operation
22
5
Check-out and Operation
22
5.1
Turning the Welding Unit On
22
5.2
Entering the Welder ID Code
22
5.3
Connecting the Fitting
23
5.4
Reading the Fitting Code with a Handheld Scanner
23
5.5
Direct Welding with the AutoWeld Feature
23
5.6
Starting the Welding Process
24
5.7
Welding Process
24
5.8
End of Welding
24
5.9
Aborted Welding Process
24
5.10 Cooling Time
24
5.11 Returning to the Start of Parameter Input
24
5.12
Using ViewWeld to Manage Logged Welding Reports, Print Tags,
and Assign Geo-data
24
6
Additional Information in the Welding Report
25
6.1
Entering Preformatted and User-defined Traceability Data
25
6.2
Entering or Changing the Job Number and Joint Number
25
6.3
Entering or Changing Additional Data
25
6.4
Entering the Fitting Traceability Code
26
Summary of Contents for ROWELD ROFUSE Print+ V2
Page 70: ...68 Notes ...
Page 71: ...69 Notes ...