16.0 Periodic Maintenance
PM-LP-006b
Page: 6/10
Component:
Single-acting actuator
Task:
LP type 1 and type 2 pneumatic cylinder seals replacement
Equipment, Tools, Materials:
Spare seals
Wrench
Lifting tools
Project documentation
Warnings:
Preliminary Operations:
INSTRUCTION VALID FOR BOTH SPRING DOWN AND SPRING UP
25. Unfasten screws (21) and remove flange (22)
26. Remove O-ring (23) and seals (24) and (25)
21
25
22
23
24
INSTRUCTION VALID FOR BOTH SPRING DOWN AND SPRING UP
27. Carefully clean the seals grooves
28. All the removed parts must be thoroughly cleaned, inspected and de-burred as necessary
29. Replace all seals and lubricate them with a grease film
30. Lubricate all sliding parts. Use only recommended grease
INSTRUCTION VALID FOR BOTH SPRING DOWN AND SPRING UP
31. Replace O-ring (23) and seals (24) and (25)
32. Replace flange (22) and fasten screws (21)
21
25
22
23
24
A4
US
US
A4
US
A4
US
A4