Smart Positioner
YT-2500 / 2550 / 2501 Series
Product Manual
Ver. 1.34
36
Fig. 5-4: Remote sensor and cables (Only YT-2501)
5.3
Ground
1)
Ground must be done before operating the positioner.
2)
Open base cover and there is an internal ground “F.G” on the left hand.
An external ground bolt is located next to the conduit entry. Please make sure that the resistance
is less than 100 ohm.