______Have the operator read through the operation manual before training begins. This will help him
be familiar with the button pushing sequences. Have the operator read through the manual again
after training and some of the sequences will make more sense.
MACHINE START-UP
When starting the machine for the first time, it may move out of control. Make
sure all hands are clear of machine parts. Be ready to press the Emergency
Stop button if needed.
______Turn main power on from the main incoming breaker box.
MACHINE MOVEMENTS
______Make sure there is nothing obstructing the full vertical travel of the machine.
______When the machine is on the clamp mode and the air pressure is with the requirements, try to
move workhead to verify that you have a solid clamp of Work head.
______Place the level on the leveling post. The level assembly is referenced to the spindle via the level
pin. It is therefore important to check alignment of the pin in reference to the spindle. Even though
the level has been carefully calibrated at the factory, it is a good idea to recheck calibration before
putting the machine into service. In the event that the level is dropped or handled roughly then
the following recalibration methods should be implemented. If calibration is required refer to the
manual for Calibrating the Digital Level
______Start the spindle and verify operation.
INSTRUCTING THE OPERATOR:
Note: Rotter employees and representatives per company policy are not permitted to provide end
user of Rottler equipment with any OEM specifications for the workpiece that is created by end
user using Rottler equipment.
______ Explain to the customer and operator that at NO time is there to be any software or hardware
other than Windows Auto Update and Rottler installed on this machine. This includes screen
savers, anti-virus software, and any hardware device that installs software on the machine.
Installation of screen savers and anti-virus software can cause dangerous control problems. Any
installation of software or hardware will void the warranty on the machine.
______Explain to the customer and operator that the machine should be hooked up to the Internet
anytime it is on. The software on the machine will automatically connect to our server to send
back useful information on machine status.
______Explain to the customer and the operator how the to log onto Skype and communicate with Rottler
when needed.
______ Computer Viruses will cause the machine control system to become unstable. This may cause
the machine to make uncontrolled moves which could create a dangerous environment for the
machine operator.
______Connect customer supplied Internet to the machine. Verify that the Internet is accessible from the
machine.
Summary of Contents for SG10A
Page 2: ......
Page 4: ......
Page 8: ...Section 1 Introduction SG10A Manual www rottlermfg com 1 4...
Page 22: ...Section 2 Installation SG10A Manual www rottlermfg com 2 13...
Page 61: ...Section 5 Operating Instructions SG10A Manual www rottlermfg com 5 15...
Page 62: ...Section 5 Operating Instructions SG10A Manual www rottlermfg com 5 16...
Page 82: ...Section 6 Maintenance SG10A Manual www rottlermfg com 6 9...
Page 90: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 3 Base Table and Riser Assembly...
Page 91: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 4...
Page 92: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 5...
Page 93: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 6 Base Assembly...
Page 94: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 7...
Page 95: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 8...
Page 96: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 9 Spindle Assembly...
Page 97: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 10...
Page 98: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 11...
Page 99: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 12...
Page 100: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 13 Transmission Assembly...
Page 101: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 14...
Page 102: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 15...
Page 103: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 16 Head Support Assembly...
Page 104: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 17...
Page 105: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 18...
Page 106: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 19 Pneumatic Circuit Diagram...
Page 107: ...Section 8 Machine Parts SG10A Manual www rottlermfg com 8 20 Electrical Components...
Page 110: ...Section 9 Options SG10A Manual www rottlermfg com 9 2...
Page 112: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 2...
Page 113: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 3...
Page 114: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 4...
Page 115: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 5...
Page 116: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 6...
Page 117: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 7...
Page 118: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 8...
Page 119: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 9...
Page 120: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 10...
Page 121: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 11...
Page 122: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 12...
Page 123: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 13...
Page 124: ...Section 10 Material Data Safety Sheets SG10A Manual www rottlermfg com 10 14...