background image

KIT CONTENTS:

 

(2) Roof Sections

 

(1) 5’ Molding

 

(12)

 

 1/4”

-

20 x 3/4” Bolts

 

(12) 1/4”

-

20 Acorn Nuts

 

(24)

 

1/4” Flat Washers

 

(6) 1/4” x 1” Fender Washers

 

(6) 1/4”

-

28 x 1” Bolts

 

(6) 1/4”

-

28 Nylock Nuts 

 

(6) Black Spacers

 

(6) 1/4” P

-

clamps

 

 

 

 

 

Thank you for choosing Rough Country for all your UTV needs.

 

Please read instructions before beginning installation. Check the kit hardware against the kit contents shown below.  Be 
sure you have all needed parts and know where they go.  

 

If question exist, please call us @1

-

800

-

222

-

7023. We will be happy to answer any questions concerning this product.

 

Check all fasteners for proper torque. Check to ensure for adequate clearance between all components.

 

Periodically check all hardware for tightness.

 

TOOLS NEEDED:

 

1/4” Drill

 

Drill Motor

 

7/16” Socket/Wrench

 

Ratchet

 

Marker

 

Knife or Scissors

 

 
 
 

Universal 60” Wide UTV Roof

 

92179500000

 

Installation Instructions

 

1.

 

Working from one side to the other, slide the supplied H molding onto one of the roof sections. 

Leave some of the 

molding overhanging on each side, to be trimmed flush with the edge after the roof assembly is 
complete.  

See Photos 1 & 2.

 

 

Photo 1

 

Photo 2

 

Reviews: