Machine Setup Procedures
Rovema VPK Operators Manual
3/2000 VPK REV(B) PANELVIEW 600
6-9
Vertical Seal Setup
To position the device:
1.
Loosen the position locking levers.
2.
Slide the vertical sealing device towards the forming tube until the
sealing band is 18 millimeters away from the forming tube in the
retracted position.
3.
Use the positioning scales to ensure that both sides of the device
are the same distance from the tube.
4.
Tighten the locking levers.
5.
Loosen the lateral adjustment bolts.
6.
Slide the vertical sealing device until the vertical sealing band is
centered on the silicon strip embedded in the forming tube
7.
Tighten the lateral adjustment bolts.
Figure 6.9
Shows the vertical sealing device and its positioning devices.
Position
Locking Lever
Lateral
Adjustment Bolts
Positioning
Scale