Maintenance Procedures
Rovema VPK Operators Manual
3/2000 VPK REV(B) PANELVIEW 600
10-1
Maintenance Procedures
The following procedures describe how to clean and maintain the
bagmaker. The scheduling of the procedures is based on the bagmaker
running one shift per day (hours per shift). If the bagmaker is operating
for more or fewer shifts, adjust the cleaning and maintenance schedules
accordingly.
Note:
Before performing any cleaning or maintenance procedures,
ensure that the bagmaker is locked-out. See section 2-0, Safety
Instructions.