8.3
Status of Scanner
The following information is given under
Status
:
Status of connection between
scanner and PC
Whether an original was placed and if
yes its approximate width
Whether calibration is required
Whether maintenance by the ROWE
Service is required
Under
Protocol
you can see the scanner's
intensity of utilization. There you can see the
number of scans already effected, the overall
scan length, as well as the operating hours of
the scanner.
Under
Version
you can see detailed
information on the software version as well as
firmware of the scanner. Usually, only the
entry "
Software Release
" (here 1.3.0) is
important.
Figure 8.3: ConfigManager - Status
8.4
Calibration
Under
Calibration
you can calibrate the
scanner again. A new calibration is always
recommended if the scan quality seems to
have deteriorated. Moreover, calibration is to
be effected at regular intervals – depending on
the degree of utilization.
In order to perform a calibration you simply
have to follow the instructions given on the
screen. In this respect, also refer to Chapter
2.11).
Figure 8.4: ConfigManager -
Summary of Contents for Scan 850i
Page 126: ...set ...
Page 137: ...C About this System Copyright 2003 2017 ROTH WEBER GmbH All rights reserved ...
Page 139: ...C 2 Production date The production date can be found on the type label ...
Page 140: ...D Declaration of conformity ...
Page 141: ......