33/48
2. Preparing the Product for Operation
2.1 Unpacking the scope of supply
Check whether the scope of supply is complete and free of defects immediately after ope-
ning the packaging. Contact the seller immediately if the scope of supply is incomplete or
defective. Do not put the appliance into operation if it is defective.
2.2 Keeping the original packaging
Keep the original packaging in a safe place over the entire service life of the product. Use
the packaging for storing and transporting the appliance. Only dispose of the packaging
after the product service life has come to an end. You can find information on the proper
disposal in Chapter 8.
2.3
Setting up the appliance
2.3.1 Base assembly
The appliance may only be set up on a secure, horizontal and stable base.
Only connect the appliance to the mains socket after complete assembly.
Before the appliance can be put into operation, it is necessary to screw together all indivi-
dual device parts.
1.
First fasten the lower tube section (see Fig. 1a) to the base
by screwing the 3 screws into the openings provided for
this in the base.
Fig. 1a: Base
2.
Then pull the decorative cone (see Fig. 1b)
over the lower tube section as far as the
base.
Fig. 1b: Decorative cone
GB