34/48
3.
First connect the middle tube section to
the lower tube section (see Fig. 1c). Use
the thread provided for this. Then connect
the upper tube section to the middle tube
section.
Fig. 1c: Tube sections connection
2.3.2 Heating head assembly
Fig. 2: Heating head assembly
1.
Place the switch box (Fig. 2, No. 1) on the upper tube section.
2.
Guide the cover (Fig. 2, No. 2) from below into the gap of the switch box (Fig. 2, No. 1).
3.
Tighten the knurled screw (Fig. 2, No. 3) until the switch box (Fig. 2, No. 1) is securely
fastened to the tube.
2.3.3 Setting the heating head
If a heating head is folded down it will automatically switch off.
1.
To switch the heating head on again, hold this at the
bracket (see Fig. 3a). Carefully press the heating head
upwards until you hear it latch into place.
Fig. 3a: Setting the heating head
1
2
3
GB