background image

Apex panel

35mm

View from inside the building  looking up
at the roof apex

35mm

Apex panel

Stagger screws as shown, screw
through the apex cover into the
purlin.

Apex cover

50mm

50mm

50mm

35    mm

8. Verandah

Lay the verandah floor butted centrally up against the front of the building. Position a verandah fence at each end with the fence frames sitting on the verandah floor and the
railings overhanging the floor edge. Secure the fence to the front of the building using 3 x 50mm screws. Use 3 x 50mm screws to attach each fence to the floor. Fix a v      eran-
dah roof support to the end of each fence using 3 x 50mm screws per support, ensure the angled end of the support is at the top and is angled in the same direction as the roof.
Place a hand rail on top of each fence and secure down using 3 x 35mm screws.

50mm

Roof batten is set 14 mm from
the end of the panel. This end
goes to the roof ridge

Felt batten is flush
with the end of the
panel.

Observe the correct

orientation of the

roof panels.

              Side view of roof panel

Side view of fitting the roof

S  crew through roof into roof
purlin and the top frames of the
side panels.

Roof purlins

Side panel top frame

Important

It is recommended to drill pilot
holes for all screws in this section
with a 2mm drill bit.

Drill

It is recommended to drill pilot
holes for all screws in this section
with a 2mm drill bit.

Drill

35mm

55mm

Roof panels must

overhang the back of

the building by

55mm.

Important

9. Roof

Lift a rear roof panel into position at the back of the building, hooking the roof batten over the upper roof purlin, Ensure this panel overhangs the back of the building by
55mm, secure to the two roof purlins and the top frame work of the side walls using 6 x 35mm screws. Working towards the front of the building, hook a centre roof panel
over the upper purlin and with it pushed right up against the first panel secure in the same way. Add the front roof panel overhanging the veranda secure down with                  3
x 35mm screws into the purlins. Secure the veranda roof supports using 1 x 50mm screw per support, screw through the support into the roof rafter, ensuring the support
is vertical using a spirit level. Attach the three roof panels for the other side of the roof in the same way.
Fit the verandah roof gussets on the inside of the verandah roof to the roof rafters as shown. Attach the gusset using 4 x 50mm screws, screwed through the gusset into the
roof rafters. Inside the building fit the apex cover to the two centre purlins using 6 x 35mm screws.

Summary of Contents for Arley Summerhouse

Page 1: ...panels 2 5 Left door 1 6 Right door 1 7 Apex panels 2 8 Front right back left roof panel 2 9 Front Left back right roof panel 2 10 Middle roof panel 2 11 Roof purlins 36 x 29 x 2050mm 4 12 Cover strip 48 x 12 x 1690mm 7 13 Kick strip 38 x 12 x 1360mm 1 14 Window 2 15 Glazing 370 x 264mm 24 16 Glazing 190 x 370mm 6 17 Window beading 375mm 60 18 Window beading 250mm 48 19 Window beading 165mm 12 20 ...

Page 2: ...25mm View from inside of window 1 Floor Prepare a level area for the summerhouse to sit Attach three wooden or similar bearers of size 50 x 50 x 2050mm to each of the floor sections not supplied in kit Place the two sections in position butted up next to each other Attach four wooden or similar bearers of size 50 x 50 x 840mm to the verandah floor Panel frames rest on floor Panel cladding overhang...

Page 3: ... screws Attach to the front apex the door frame beading using 3 x 25mm nails Secure it to the bottom of the framing up against the cladding 560mm from the left hand front panel as shown below Shiplap cladding Apex frame 560mm Door frame bead ing 25mm 40mm Drill 6 Roof purlins Insert the four roof purlin into the rebates in the apex sections Fix in place at the ends of the purlin using 2 x 50mm scr...

Page 4: ...frame Important It is recommended to drill pilot holes for all screws in this section with a 2mm drill bit Drill It is recommended to drill pilot holes for all screws in this section with a 2mm drill bit Drill 35mm 55mm Roof panels must overhang the back of the building by 55mm Important 9 Roof Lift a rear roof panel into position at the back of the building hooking the roof batten over the upper ...

Page 5: ... x 10mm felt nails evenly spaced Tension the felt over the roof and secure along the upper edge using 8 x 10mm felt nails Repeat this for the second piece of felt on the other half of the roof Once the two pieces of felt are in place take the 3m ridge felt roll and place over the apex of the roof making sure it sits centrally over the roof ridge and overlaps the other two felt pieces attach using ...

Page 6: ...e right to change the specification of our products without prior notice If in doubt of any aspect regarding the assembly use or safety of your building please contact us Help Line Normal Office Hours 01829 261121 ROWLINSON GARDEN PRODUCTS LIMITED Green Lane Wardle Nr Nantwich Cheshire CW5 6BN 2011 Rowlinson Garden Products Ltd Important information retain for future reference To VALIDATE the guar...

Reviews: