background image

Before assembly

We recommend that time is taken to 
read the instructions before starting 
assembly, then follow the easy step 
by step  guide.The instruction sheet 
is only a guide to the assembly. 
Certain items may not be shown to scale. 

Check all components prior to assembly

This product should be assembled 
by no less than two people.

Never attempt to erect the assembly
in high winds.

Drill all components where indicated.

Recommended tools for assembly

Cross head screw driver           

Drill with 3mm diameter drill bit

x 2

Drill

No.

Fixing Kit

Qty.

17

Black T-hinge

8

18

Towerbolt and catch plate

3

19

Chains

4

20

70mm screws

2

21

50mm screws

30

22

40mm screws

2

23

25mm black screws

81

24

19mm black roundhead screws

24

25

19mm silver roundhead screws

4

1

2

3

4

5

6

7

8

9

10

11

12

7. Bolts

Position a towerbolt at the top of each door and their catch plates on the door header strip as shown. Ensure the bolts
align with the catch plates so that the bolts fits in the catch plate when in the locked position. Secure each bolt using
4 x 19mm black round head screws and 4 x 19mm black round head screws for each catch plate. Position a third tower
bolt and catch plate in line with the bottom door hinges. Attach the bolt to one door and the catch plate to the other.
Ensure the bolt slides into the catch plate and fix using 4 x 19mm black round head screws and 4 x 19mm black round
head screws for each catch plate.

Pent Double Bin Store

Assembly Instructions

English SS354B

13

15

14

No.

Components

Qty

.

1

Back panel

2

2

Left side panel

1

3

Right side panel

1

4

Back panel joint rail

(35x28x250mm)

1

5

Lid stay block 

(35x28x150mm)

2

6

Door frame uprights 

(28x28x1090mm)

2

7

Door header frame 

(45x28x1330mm)

1

8

Base rail 

(45x15x1330mm Beveled)

1

9

Door hinged strip 

(63x12x1115mm)

2

10

Header strip 

(50x12x1424mm)

1

11

Lid hinge strip 

(50x12x1500mm)

1

12

Left door

1

13

Right door

1

14

Left lid

1

15

Right lid

1

16

Lid stay 

(28x15x650mm)

2

16

17

18

19

19mm

black

19mm

black

19mm 

50mm

Using the bin store

Position the bin inside

the store, loop the

chains around the

handles of the bin and

attach the S hook to one

of the chain links.

Ensure the lid of the bin

shuts fully when the lid

is down.

Biocidal Products Regulation EU 528/2012

Permawood ACQ1900 treated wood is a treated article that incorporates biocidal
products: copper hydroxide and Benzalkoniumchloride. They protect wood against
fungal decay /rot/ and insect attack.Keep away from food, drink and animal feeding stuffs.
Avoid breathing dust when cutting treated wood.

2016 © Rowlinson Garden Products Ltd

If in doubt of any aspect regarding the assembly, use or safety of your bin store please contact us :

Help Line: (Normal Office Hours)  01829 261 121
Email: support@rowgar.co.uk

ROWLINSON GARDEN PRODUCTS LIMITED
Green Lane
Wardle Nr. Nantwich
Cheshire
CW5 6BN

www.rowgar.co.ukv

We constantly improve the quality of our products, occasionally the
components may differ from the components shown and are only
correct at time of printing. We reserve the right to change the
specification of our products without prior notice.

8. Lid stays & chains

Secure a lid stay to the inside of the side panel top frames, using 1 x 50mm screw per stay. Attach two chains to each
lid. Screw through the end link of each chain into the side of the lid frames as shown using 1 x 19mm silver round head
screw for each chain  .      

Reviews: