Installation
1
Route the protective bonding
conductor through the aperture.
2
Remove all nuts and the two
counter frames.
3
Attach the protective bonding
conductor to the earthing
terminal.
4
Insert the frame from the outside
of the cabinet. Ensure that the
gasket is placed between the
frame and the cabinet.
A
5
Observe the intended wedge
areas (A) without stopping edges.
6
Attach the two counter frames
from the inside of the cabinet.
7
Tighten the nuts crosswise in
small steps. Recommended
torque 4 Nm. Do not overtighten
the nuts.
8
All BG frames must be clean
and have electrical contact
with protective earth. National
regulations apply.
11
Correct placement of a cable in
a CM BG B module. The cable
armor shall be visible outside the
module.
12
Remove the core and fold out the
braid.
9
Remove the outer jacket and any
plastic foil. The cable armor shall
be clean and conductive.
10
Secure the end of the cable
armor. Suggestions for cable
preparations are available on
www.roxtec.com.