3-1-38
2A3/4
3-1-6 Installing the drawer heater (service part)
Drawer heater installation requires the following parts:
Drawer heater (P/N 33960020): for 220 - 240 V specifications
Drawer heater (P/N 34860030): for 120 V specifications
Heater switch (P/N 68427020)
Dehumidifier relay cable (P/N 2AC60020)
Two M4
×
8 S tight screws (P/N B3324080)
Binding band SG-130 (P/N M2107120)
<Procedure>
1. Remove the four screws holding the upper drawer and then the drawer.
2. Remove the two screws holding the lower left cover and then the cover.
3. Remove the lower drawer.
4. Pass the 2-pin connector of the drawer heater cable to the machine rear through the
cable hole in the left back corner of the machine.
5. Fit the drawer heater using the two screws.
6. Attach the binding band to the drawer heater cable and insert the band into the hole
in the bottom of the machine.
Drawer heater
Cable hole
2-pin connector
Binding band
Screws
Figure 3-1-47
Summary of Contents for Ri 4230
Page 3: ...SERVICE MANUAL Ri 4230 5230 ...
Page 13: ...4230 5230 S M MCA THEORY AND CONSTRUCTION SECTION I I Theory and Construction Section ...
Page 14: ...1 1 5 2A3 4 CONTENTS 1 1 Specifications 1 1 1 Specifications 1 1 1 ...
Page 100: ...4230 5230 S M MCA ELECTRICAL SECTION II II Electrical Section ...
Page 119: ......
Page 138: ......
Page 159: ...4230 5230 S M MCA III Set Up and Adjustment Section III SET UP AND ADJUSTMENT SECTION ...
Page 448: ...2A3 4 3 6 3 25 Toner scatters at the leading edge of the image See page 3 6 17 ...