REGULAR USE
Ch. 6A
Coffee delivery is
started by pressing
the relevant push
button and stopped
by pressing it again.
1.
When the machine is switched on, the electro-
nic card checks water level inside the boiler. After
approx. 3 seconds, the filling pump and solenoid
valve are enabled for filling. When the set level is
reached, the card enables the console and its push
buttons. Coffee delivery is started by pressing he
relevant push button and stopped by pressing the
same button again. The above-indicated opera-
tions are signalled by the relevant LEDs lighting
up and going off.
2.
The boiler filling function is disabled while
coffee is being made. If at the end of the coffee-
making cycle the boiler level probe is above the
water level, the boiler filling function will be ena-
bled to restore water level.
3.
2-minute filling time-out. At the end of this
interval, the LEDs will blink and the machine
will stop. Switch the machine on again to restart
it.
4.
Coffee delivery time-out. After 2 minutes,
delivery of the current coffee doses is interrupted.
Safe, and efficient elec-
tronic components
PUSH-BUTTON OPERATION / LEVER OPERATION /
BT BUTTON OPERATION
Ch. 6
1.
Steam is delivered by turning the side knob
with a steam cloud sing on it.
2.
Hot water is delivered by means of the central
knob (or side compact-ergonomic knob) with the
hot water drop sign.
3.
To deliver coffee from the coffee spouts, fill the
filter holder with the correct quantity of coffee
put it back above the coffee spout and press the
relevant push-button on the steel front (if the
machine is fitted with an electronic console, refer
to chapter 7).
4.
The double-range pressure gauge on the front
constantly measures boiler pressure (0,9 - 1,1
BAR) as well as coffee delivery pressure (8-10
BAR).
5.
Adjust pressure inside the boiler to the usual
specifications by means of the relevant screw on
the pressure gauge.
6.
Adjust coffee delivery pressure to the usual
specifications by means of the relevant screw of
the internal pump.
7.
Frequently check the boiler level indicator and
double-range pressure gauge.
8.
To deliver coffee in the lever model, activate
the manual lever positioned latelly to the group.
The coffee machine is
ready to make perfect
coffees always and
everywhere.
INSTRUCTIONS FOR ELECTRONIC DOSING
Ch. 7
1.
Press button
*
relating to the coffee spout of
the dose to be programmed. Keep it pressed for
longer than 5 seconds and check that all pro-
gramming LEDs on the console light up. This
indicates that the programming function has
been started correctly.
2.
Press any of the buttons corresponding to the
4 doses that can be programmed. The LED corre-
sponding to button
*
and that corresponding
to the dose being programmed remain on.
3.
When the desired quantity of coffee is reached
(4 doses), press any of the dose buttons to inter-
rupt product delivery.
4.
The console on the left automatically stores
the memory of the others. Continuem if neces-
sary, to set the remaining consoles.