background image

 

Cascade Fence Installation Instructions 

3/08

1)

 Dig postholes 72” on center. Holes 

should be 9-12” in diameter and 30” in 
ground. (Fig. 1) 

2)

 Place post in hole and tap down so 

that there is 2” of clearance from 
ground. (Do not set posts 
permanently in place at this time) 

3)

 (Fig. 3) Insert the reinforcement rail 

into the bottom rail. Insert rail locks 
into rail lock holes. Install bottom rail 
into posts.  

4)

With bottom rail installed, level bottom 

rail by tapping on posts. Make sure to 
maintain 2” ground clearance.  

5)

 When posts and rails are leveled, 

postholes may be packed and filled. 
Crushed stone or concrete may be used. 
If using concrete, let concrete set before 
continuing installation. Keep concrete 
4” – 6” below ground level. 

6)

 Install top rail in same fashion as 

bottom rail in operation #3. (Fig. 2) 

Note that the picket holes are larger 
on the rail bottom and face down!

 

7)

 Install pickets by inserting down 

through the top rail and locking tabs into 
the bottom rail. 

 

8)

 Install picket caps and post caps 

(4” flat shown) by pressing into 
place. A dab of PVC glue may be 
used to secure caps permanently in 
place. (Fig. 2) 

Picket Cap

7/8” x 3” 

 Picket

Top Rail 

Notched Tab

Bottom Rail

Post Cap 

Post 

Fig 2 

Fig 1

Reinforcement 
        Rail 

Fig 3 

 

Royal Outdoor Products. PO Box 360. Milford, IN 46542 

Phone 800-365-3625. Fax 574-658-3147

 

Reviews: