3
Installation
The instrument must be unpacked, installed and checked by a trained engineer prior to first operation.
Detailed installation instructions are given in the Interrliner Installation manual.
Connect the instrument only to a properly earthed power connection.
3.1 - Main power connections
The main switch for the ESR analyser unit is located at the left side of this instrument.
The main switch for the Interrliner rack transport units is located in the cabinet beneath the Start-Pool.
Attention
: The sample robot unit is powered by the ESR analyzers power supply. Switching the
transport units OFF will not switch OFF the sample robot!
A central power distribution block to connect all units and auxiliary devices to is located at one of the rear
support legs near the Start-pool. This distribution block has a main switch and an indicator light showing the
status ON or OFF.
Check if all the power cables from the ESR analyser unit(s) and printer(s) are connected to the distribution
block.
Note
: Do not switch the Interrliner OFF during normal operation!
Installation
20
MRN-164_2-EN Version 2.02 Interrliner