background image

Flush Installation Instructions

1. Break out the ÔknockoutsÕ
as required in the top and
bottom panel BUT DO NOT
touch the inner paneis as
yet.

3. Knock out the rear plate of
the packing and place it
inside the box.

4. Adjust the box inside the
aperture.  Using the box fixing
lugs you will get the right
plaster depth.
4a. Install the conduits.
4b. Cement the box into

place.

7. Pull in the wires and
connect the earth and
neutral conductors.  Build in
the pre mounted ÔdinÕ rail
equipment and make the
necessary connections.

8. Separate the masking plate
from the masking frame.

5. Plaster around the box.
When dry, remove the
packing.

6. Only then remove the
knockouts in the inner side
panel.

9. Fix the masking plate to
the base (4 screws provided).

10. Finally fix the combined masking frame and door securely
into place, with the 4 screws provided.
(Note the door may be fitted to the left or right side.)

2. For mounting the box so
that it fits perfectly flush with
the finished surface use the
four lugs provided.  Slip
these lugs through the holes
provided in the side panels of
the base.

SUPPLIED COMPLETE WITH 4 FIXING LUGS, EIGHT SCREWS, 4 SCREW CAPS, EARTH BLOCK, NEUTRAL BLOCK & 14
WAY BUSBAR.

RS Components              

Issued November 1993

5601

Reviews: