13
4.
Apply the Grip tape to
the gunwale edge. Start
approximately 200mm
in front of the shrouds.
Before fixing in place
and make sure the area
is clean and dry.
5.
Fix the larger Bow shackle
(provided in the Trapeze pack)
to the Shroud U bolt. Make
sure the lower shroud is
attached before inserting the
pin and tighten.
6.
Reattach the spinnaker sheet ratchet to the new Bow shackle.
7.
Locate the two pieces of
elastic in the pack and
attach them to the ‘P’
clip on the tack bar
8.
Pass the free end of
the elastic through the
new Bow shackle fitted
to the shroud U bolt
(cockpit to gunwale
direction) and tie a
Bowline.
Summary of Contents for LDC 2000
Page 1: ...1 LDC 2000 Rigging Guide...