16.1 - Adding the Gennaker Uphaul/Downhaul Takeaways
Untie the gennaker downhaul line from the top
patch and unthread it from the other patch(es)
on the gennaker. Pull the line out of the block on
the front port toestrap fitting.
Tie the elastic to the eyelet on the transom, just
above the bung.
Thread the loose end of the elastic aft
from the cockpit, through the tube that
runs through the aft locker and out the
hole in the transom.
Locate the gennaker uphaul/downhaul takeaway elastic (with a 20mm
block attached) from the SCS kit.
Summary of Contents for Venture Connect
Page 1: ...Rigging Guide V3...
Page 8: ...Rigging Guide PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 23: ...Rigging Guide 5 Sails PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 36: ...Rigging Guide 7 Keel PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 42: ...Rigging Guide 9 Reefing PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 96: ...Power Assisted Steering and Mainsheet V2 PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 113: ...19 3 Afloat a b c...
Page 125: ...PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER Seated Control System 22 Problem Solving...
Page 128: ...SCS Modifications...
Page 132: ...Appendix 1 Steering System...
Page 133: ...Rigging Guide 10 Completion PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 135: ...Rigging Guide 11 Sailing Hints PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 139: ...Rigging Guide 12 Maintenance PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 142: ...Rigging Guide 13 Warranty PLEASE FOLLOW RIGGING GUIDE IN CORRECT ORDER...
Page 146: ...Rigging Guide 15 Glossary...