background image

Page 4 of  5

Function Tests

It’s a good idea to perform the following function tests to ensure the RHS780 is operating correctly
prior to using it to service an A/C system. These tests will also demonstrate some of the basic
operating functions.

The technical support group at RTI Technologies should be contacted if any problems or
questions arise during the following tests. Call 800-468-2321 (ext. 259) for assistance.

EVACUATE HOSES AND TEST VACUUM PROCESS:

1. The RHS780 should be set up and refrigerant transferred into the internal cylinder as described previously. The

tank of new refrigerant (with hose attached) should have been disconnected from the RHS780 and the plastic cap
installed on the port.

2. Plug in power cord and press top of power selector switch. The display will show 

WEIGHT = XX.X LB -

AUTOMATIC?

3. Press 

[

_

_

_

_

key two times. The display will show 

WEIGHT = XX.X LB - VACUUM?

.

4. Press 

[ENTER]

 key. The display will show 

ENTER VACUUM - TIME XX MIN.

5. Press the 

[

<<<<

]

 key one time to move the blinking cursor one position to the right. Press 

[

_

_

_

_

]

 key two times until the

display shows 

ENTER VACUUM - TIME 02 MIN

.

6. Press 

[ENTER]

 key. The display will show 

PERFORM LEAK TEST?  Y/N

. Press 

[

<<<<

]

 key as required until 

N

 is

flashing to indicate that a leak test is not desired.

7. Press 

[ENTER]

 key. The display will show 

ADD OIL? Y/N

. Press 

[

<<<<

]

 key as required until 

N

 is flashing to indicate

that adding oil is not desired.

8. Press 

[ENTER]

 key. The display will show 

START?

.

9. Press 

[ENTER]

 key. The display will show 

TIME LEFT = XX MIN - PUMP ON

. The vacuum pump will start

running. Watch the High and Low pressure gauges to verify that the pressure drops into a vacuum as the red and
blue hoses are evacuated. The display will show 

PUMP OFF XX MIN - CONTINUE?

 at the end of two minutes.

10. Press 

[ENTER] 

key. The display will show 

WEIGHT = XX.X LB - AUTOMATIC?

. Continue to next test.

FILL HOSES AND TEST CHARGE PROCESS:

1. Press 

[

_

_

_

_

key three times. The display will show 

WEIGHT = XX.X LB - CHARGE?

.

2. Press 

[ENTER] 

key. The display will show 

ENTER CHARGE - AMOUNT = XX.X LB

3. Press the 

[

<<<<

]

 key one time to move the blinking cursor to the right one position. Press the 

[

_

_

_

_

]

 key one time until

the display shows 

ENTER CHARGE - AMOUNT = 01.0 LB

.

4. Press 

[ENTER] 

key. The display will show 

CHECK HIGH-LOW - CHARGE SWITCH

. This message is asking if

you want to charge through the red high side hose or the blue low side hose. For test purposes we will charge
through one and then the other to fill both hoses with refrigerant. The High-Low Charge Switch is on the left side
of the RHS780 above the port where the yellow hose was connected during the filling of the internal cylinder. Press
the top of this switch. 

5. Press 

[ENTER] 

key. Refrigerant will fill the blue low side hose. The low pressure gauge will show the pressure

rise from a vacuum to the pressure of the refrigerant charged into the hose. Next press the bottom of the High-Low
Charge Switch. Refrigerant will fill the red high side hose. The high pressure gauge will show the pressure rise
from a vacuum to the pressure of the refrigerant charged into the hose. The display will show 

WEIGHT = 01.0 LB -

CHARGING

. The amount may or may not change as the two hoses are filled.

6. Press 

[RESET]

 key. The display will show 

WEIGHT = XX.X LB - AUTOMATIC?

 Continue to next test.

Summary of Contents for RHS780

Page 1: ...our new machine survived any rough handling it may have experienced during transport 2 Immediately report any visible damage to the unit Save the shipping carton for inspection by a claims adjuster Call RTI Technologies at 800 468 2321 ext 259 for instructions 3 Cut and remove all hold down straps including the one underneath the front of the unit 4 Remove protective plastic cover 5 Carefully tip ...

Page 2: ...Hose 3 Connect other end of Red Hose to left port when facing back of unit on rear of RHS780 The port has a red band 4 Install Blue Field Service Coupler on end of Blue Hose 5 Connect other end of Blue Hose to right port when facing back of unit on rear of RHS780 The port has a blue band 6 The Field Service Couplers should be connected to the parking fittings on the front of the RHS780 when not in...

Page 3: ...frigerant up side down 2 Connect the anti blowback valve end B of the 30 inch yellow hose to the fill port on the side of the RHS780 3 Plug in power cord and press top of power selector switch The display will show WEIGHT XX X LB AUTOMATIC 4 Press _ key four times The display will show WEIGHT 00 0 LB FILL CYLINDER 5 Press ENTER key The display will show CHECK HOSES START 6 Open valve on tank of ne...

Page 4: ...pump will start running Watch the High and Low pressure gauges to verify that the pressure drops into a vacuum as the red and blue hoses are evacuated The display will show PUMP OFF XX MIN CONTINUE at the end of two minutes 10 Press ENTER key The display will show WEIGHT XX X LB AUTOMATIC Continue to next test FILL HOSES AND TEST CHARGE PROCESS 1 Press _ _ _ _ key three times The display will show...

Page 5: ...sed 5 Press ENTER key to end the process CONGRATULATIONS THANKS Performing these tests demonstrated that the RHS780 is operating correctly NOW IT S TIME TO MAKE SOME MONEY The best suggestion we can offer is that you quickly browse the Operation Manual before using the RHS780 to perform an actual A C service Then during the first few uses refer to the Operation Manual and follow the instructions a...