3. Installation Procedures
RuggedCom® RuggedMAX™
31
Installation Guide Rev 1.1
3.6. Power Connections
3.6.1. Copper and SFA Type Base Station
The power system can be supplied by RuggedCom (WiNPS) or by the operator.
Connect the power system DC + ETH output to the supplied connector and cable.
Connect the other end (open end) of the supplied cable to the WiN7000 High Power Base Station
DC + ETH connector.
The illustration below shows the physical connection between the WiN7000 High Power Base
Station, the power system, and the AC power source.
Figure 3.20. Base Station Power Connection