3
Thank you very much for purchasing the wind turbine Black 600. You have bought a
premium product which silhouettes explicitly against products of our competitors. The wind
turbines of the Black series have no magnetic detent torque and holding torque, which allows
a start-up from wind speeds of 0,8 m/sec. From 1, 8 m/sec on, you are able to be in loading
area. The wires inside the mast will not roll up, because yaw control is made via abrasive ring
contacts.
In order to get a bigger turbine’s lifespan, there are some necessary advices for mounting the
wind turbine assuredly and reliably.
Please notice that this manual is a part of the product and has to be followed strictly, so please
read this manual carefully before installing the wind turbine. This manual should be
positioned near the product and it should be given to possible new owners.
This manual describes the function, installation, operating and attendance of the wind turbine.
It addresses itself to the raiser of the turbine who should be technically experienced. If this is
not the case, please let the installation be made by a technician.
The wind turbines BLACK are available in 12 or 24 Volt for charging batteries and in 48 Volt
for supplying feed-in converters. There will also be a 500 Watt version in the near future.
Wind turbines for battery charging which are connected to a solar panel, are appropriate to the
following appliances: street lamps, supply of gauging stations, traffic management systems,
emergency call systems, isolated systems like summer residences, garden plot, camping,
advertisement, lighting of billboards, for primary health care in developing countries,
Wireless Lan Access Point and everywhere, where there is no electrical connection. There is
also available a feed-in converter for the wind turbine BLACK which are able to feed in the
electricity network.
These information are dependable, but the manufacturer does not take responsibility for
impreciseness or omissions. The user of this information and of this product takes the full risk
and responsibility. All specifications are changeable without any other messages. Wind
turbines have to correspond to the local and national appointments, norms and laws, like other
electric devices and sources, too. In some regions, you also need a building license before
installation of the wind turbine. Before you start to mount the turbine, please check if you are
allowed to install a turbine at your location.