RG-S2600G-I Series Switch Hardware Installation and Reference Guide
Product Installation
Please ensure that you have carefully read Chapter 2. Make sure that the requirements set forth in Chapter 2 have been
met.
Installation Procedure
Confirmations before Installation
Before installation, please confirm the following points:
Whether sufficient airflow is available for the switch
Whether the requirements of the switch for temperature and humidity are met
Whether power cables are already laid out and whether the requirements of electrical current are met
Whether related network adaption lines are already laid out
Installing the RG-S2600G-I Series
Precautions
During installation, note the following points: