4 - 5
Work Procedure
434
434
(3) land leveling pattern
The land leveling work may be
performed after crushing soil or
not.
The vehicle speed can be set
faster when performing the land
leveling work with soil crushed
already.
When working in a wet field, fill
the field with a sufficient amount
of water so that the trace of
plowing cannot be seen.
The border shown in the fig-
ure should be set a little narrow-
er than two times of one plowing
width.
Refer to the alternating returning
pattern for other details.
•
•
•
•
•
Moving Direction
Reverse Driving
Finish
A: Border
Start
(15) (11)
(9) (13)
A
(14)
(10)
(4)
(5)
(3)
(6)
()
(7)
(1)
(8)
(1)
995E003A
⊙
Turning:
RK37S,RK37SC-영문-04(라).indd 5
2017-01-13 오전 10:33:02
Summary of Contents for RK37 Hydrostatic
Page 31: ...MEMO RK37S RK37SC 영문 01A 안 indd 30 2018 12 06 오후 4 33 03 ...
Page 35: ...MEMO RK37S RK37SC 영문 01B 가 indd 4 2017 03 09 오전 9 05 23 ...
Page 79: ...MEMO DESCRIPTION OF TRACTOR CONTROLS RK37S RK37SC 영문 02 나 indd 32 2018 02 01 오후 2 52 11 ...
Page 93: ...MEMO WORK PROCEDURE RK37S RK37SC 영문 04 라 indd 6 2017 01 13 오전 10 33 02 ...
Page 133: ...MEMO CABIN SYSTEM RK37S RK37SC 영문 06 바 indd 16 2017 01 13 오전 10 49 20 ...
Page 137: ...MEMO STORAGE AND DISPOSAL RK37S RK37SC 영문 07 사 indd 4 2017 03 09 오전 9 53 42 ...
Page 147: ...MEMO TROUBLESHOOTING RK37S RK37SC 영문 08 아 indd 10 2017 01 03 오후 3 19 56 ...
Page 155: ...MEMO SAFETY STANDARD FOR FARM WORK RK37S RK37SC 영문 09 자 indd 8 2017 03 09 오전 9 56 51 ...
Page 160: ...INDEX 1 INDEX 11 2 11 RK37S RK37SC 영문 11 인덱스 indd 1 2017 03 09 오전 9 59 44 ...