RS485 Test of Link Ports
1. Use the RNET PCB and RNET Version checker to test RS485 Ports.
If you have a DB9 Switch, set the switch to the RNET PCB DB9 port and
continue to Step 4. If you don’t have a DB9 Switch perform step 2 and 3.
2. Unplug the serial cable attached to the RCK DB9.
3. Plug the serial cable into the DB9 of the RNET PCB above the RCK.
4. Disconnect the RJ45 cable connected to the Link In of the MCA-C5.
This cable goes to the IR Switcher PCB.
5. Connect an RJ45 patch cable from one port of the RNET PCB to the
RNET Link In of the MCA-C5.
RNET DB9
RJ45 Port
6. Open the RNET Version Reader v1.01.02 obtained from Russound.
RCK
RNET PCB
7. Set each button on RNET Version Reader GUI to match the left picture.
8. Left click the “Get Product Info” button.
9. “Product Name” displays “MCA-C5”.
“Firmware & Bootloader Versions” displays the firmware version loaded.
10. Click the “Clear” button on RNET Version Reader v1.01.02.
11. Disconnect the RJ45 cable connected to the Link In of the MCA-C5.
This cable goes to the RCK.
Connect the RJ45 cable going to the IR switcher to the Link Out jack.
12. Perform the same test, Steps 7 – 9, with the Link Out jack of the MCA-C5.
13. If you have a DB9 Switch, set the switch to the RCK DB9 port and
continue to Step 16. If you don’t have a DB9 Switch perform step 14 and 15.
14. Remove the serial cable from the DB9 of the RNET PCB above the RCK.
15. Plug the serial cable into the RCK DB9.
16. This test passes when the Link In and Link Out jack of the MCA-C5 can
return the firmware version on RNET Version Reader v1.01.02.
17. Continue by performing the
script.
MCA-C5 Test Procedure
Rev 1.5
Page 38 of 78
Summary of Contents for MCA-C5
Page 1: ......
Page 41: ...39 Russound MCA C5 User and Installation Manual Notes ...
Page 166: ...ZXP E5 Power Supply_RevC sch 1 Thu Dec 18 16 48 45 2008 C ...
Page 167: ...ZXP E5 Power Supply_RevC sch 2 Thu Dec 18 16 48 46 2008 ...
Page 168: ...ZXP E5 Power Supply_RevC sch 3 Thu Dec 18 16 48 46 2008 ...
Page 189: ......