Taking into operation
5-4
RUTHMANN-Steiger
®
TB270
BA.GB.12-27409-05-07-FTA-jr
5.3
Measurements to be taken before operating of Ruth-
mann-Steiger
Before starting work the operating staff must familiarize themselves with
the surroundings of the work site. To the surroundings of the work site be-
long e.g. obstacles within the working and traffic range, carrying capacity of
the ground and the necessary securing of the building site to the public
traffic area.
Note
If several persons are working in or in the area of the Ruth-
mann-Steiger, a supervisor must be determined.
Checks before operating the Ruthmann-Steiger:
Fuel reserves,
Oil level in hydraulic oil tank,
Rotating flashing beacons,
Visual check for damage (fissures, deformations, corrosion at car-
rying parts, fastenings and locking of removable connections and
covers, leakages, etc.),
Check of the spaces for the sequences of movements of the me-
chanical constructional components incl. all hydraulic cylinders,
Cleanness and function of the sensory system,
Earthing (e.g. when being used at or nearby transmitting stations,
wind power stations or transformer stations).
Note
Check fuel and engine oil levels acc. to operating instruc-
tions of chassis manufacturer.
Check hydraulic oil level with cold oil, vehicle standing in
horizontal position and with switched-off hydraulic pump
drive.
Summary of Contents for 27409
Page 4: ......
Page 12: ......
Page 20: ......
Page 62: ......
Page 104: ......
Page 162: ......
Page 186: ......
Page 211: ...9 Maintenance BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 9 25 ...
Page 246: ......
Page 252: ......
Page 254: ......
Page 255: ...13 Spare Parts BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 13 1 13 Spare Parts ...
Page 256: ......
Page 258: ...14 Appendix 14 2 RUTHMANN Steiger TB270 BA GB 12 27409 05 07 FTA jr ...
Page 260: ......
Page 261: ...BA GB 12 27409 05 07 FTA jr RUTHMANN Steiger TB270 14 1 ...