Rutland 913 Windcharger
Owner’s Manual
Document SM-130 Issue G 26.10.06
13
Marlec Engineering Co Ltd
UP AND RUNNING
•
Before raising and securing the wind generator, check that:
1. All final mechanical checks have been made.
2. The cable is not trapped.
3. All electrical connections are secure and safe.
•
The wind generator can now be raised into position.
Take care to avoid all moving parts when raising and lowering the wind
generator.
•
When raised, secure the structure firmly in an upright position. The
performance of your Windcharger can be impaired if the pole is not vertical.
SPECIFICATION AND PERFORMANCE
The curve shown below is for ideal, non-turbulent wind conditions; this may not be achieved in some installations.
0
2
4
6
8
10
12
14
16
18
20
0
5
10
15
20
25
30
35
40
Windspeed (Knots)
Charge into 12v Battery (Amperes)
0
1
2
3
4
5
6
7
8
9
10
Charge into 24v Battery (Amperes)
WINDSPEED CONVERSION
MPH = Knots x 1.15
M/S = Knots x .515