Installation, operating and maintenance manual SKIT/S-DEB
3rd print version
page 38
6 – Preparation for commissioning
RWO GmbH
●
Marine Water Technology
●
Bremen
●
Germany
Issue 2014-04-10
Valve terminal article number: 5940652406
Pos. Description
1.2
Spare
1.4
Pneum. valve pos. 4 oil drain
2.2
Pneum. valve pos. 15 flushing water inlet
2.4
Pneum. valve pos. 5 flushing water outlet
3.2
Pneum. valve pos. 23 recirculation
3.4
Pneum. valve pos. 58 bypass
4.2
Not in use
4.4
Not in use
P
Compressed air inlet; 6 – 8 bar; pipe, outer ø 8mm
R/S
Air outlet
Tab. 10 Valve terminal
Plug connections
6.5.1
For the plug-in connections, the hose lines must meet the
following requirements: Minimum hardness of 40 Shore D
(acc. to DIN 53505 and/or ISO 868); outer diameter acc. to
DIN 73378 (max. permitted deviation ± 0,1 mm from rated
dimension); free of burrs, cut at right angle and
undamaged at the outer diameter; the hose lines must be
pressed into the plug-in connections up to the stop.
To release, press the pressure ring and pull the hose line.
Measures before commissioning
6.5.2
·
Check connections, voltage and operating
pressure.
·
Make sure that the max. operating data (see
typeplate) are not exceeded!
·
Check that the assignment of the electric
connections is as specified, on no account they
may be mismatched!