INSTALL GUIDE

Decking Systems

RynoTerraceDeck Installation Guide Rev 01 © Copyright Ryno Ltd 2019

1. Place joists around perimeter of 

area to be decked, and connect 

together using corner connectors 

and 13mm screws 

(FIG 1)

2. Level the frame to the required 

height using the pedestals/

cradles supplied 

(FIG 2)

Please note: Joist span capabilities: 

DS22 400mm between supports

DS38 600mm between supports

DS72 1200mm between supports

(600mm if using DS72 with    
RDC cradles)

Please note: Pedestals are prone to 

be brittle in very cold temperatures so 

additional care should be taken when 

clipping joist into place

3. Attach main joists inside 

perimeter frame, in a 

perpendicular direction to 

intended direction of decking   

(FIG 3,4)

  See joist span capabilities above 

for pedestal spacing. 

Please note: Joists must be 

spaced at 350mm centres and fi xed 

to perimeter joists using corner 

connectors and 13mm screws 

Please note: Wherever board ends 

meet, a double joist is required to 

board

4. Install perimeter profi le using 

13mm screws 

(FIG 5)

SUBFRAME INSTALLATION

FIG 1  

FIG 2  

FIG 3  

FIG 4  

FIG 5 