13
English
|
EN
FR
DE
ES
IT
NL
PT
DA
SV
FI
NO
RU
PL
CS
HU
RO
LV
LT
ET
HR
SL
SK
BG
UK
TR
MAINTENANCE
MAINTENANCE SCHEDULE
Before
each use
After 1st month
or 20 hours of
operation
Every 3 months
or 50 hours of
operation
Every 6 months
or 100 hours
of operation
Every year or
after 300 hours
of operation
Check engine lubricant
Change engine lubricant
Check air
fi
lter
Clean air
fi
lter
Change air
fi
lter
Check/adjust spark plug
Replace spark plug
Check/adjust idle speed
Check/adjust valve
clearance
1
Clean fuel tank and
fi
lter
1
Check fuel hose
Fuel
fi
lter
Inspect
Replace
Check all hose connections
Inspect fuel tank vapor vent
(if equipped)
Inspect carbon canister
(CARB models only)
1. These items should only be carried out by an authorised service centre.
NOTE:
Maintenance should be performed more frequently when generator is used in dusty areas.
When generator has exceeded the maximum figures specified in the table, maintenance should still be cycled
according to the intervals of time or hours stated herein.
Summary of Contents for RGN2500
Page 3: ...Fig 2 Fig 3 Fig 1 1 4 2 3 5 6 7 8 9 Fig 4 Fig 5 11 8 9 10 ...
Page 4: ...Fig 6 6 Fig 7 Fig 8 16 15 13 12 17 14 Fig 9 7 18 ...
Page 5: ...13 12 14 Fig 10 2 Fig 11 20 19 21 Fig 12 ...
Page 6: ...Fig 13 Fig 15 Fig 16 Fig 17 Fig 14 22 28 26 27 29 24 25 23 30 ...
Page 14: ......
Page 400: ...099979074033 01 Techtronic Industries GmbH Max Eyth Straße 10 71364 Winnenden Germany ...