Digging the Hole
•
Position the machine over the
desired hole replacement area.
Extending boom 12 or 14
inches and allowing enough
slack in rope to drill a straight
hole down.
•
Turn on the remote and toggle
the Auger switch to the correct
direction then lower the auger
direction then lower the auger
to begin digging.
•
NOTE:
It may be required to
lower the auger speed to allow
for booming down of the digger
derrick while digging.
•
CAUTION: Buried lines may
be in your digging area.
Summary of Contents for EZ Track 4100
Page 1: ...EZ Track 4100 Training Procedure Manual...
Page 24: ...Auger Operation Procedure...
Page 36: ...Bucket Assembly Standard Operating Procedure Operating Procedure...
Page 40: ...Hydraulic Pole Guide Procedure Procedure...
Page 41: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...