• Install hydraulic pole guide.
Refer to installation
instructions.
• Raise the boom into position
so that the lift line will be
lifting straight up. Follow load
lifting straight up. Follow load
chart specifications on weight
in relationship to boom angle.
• Install the lifting strap,
remember to position the
lifting strap according to pole
weight for balance in lifting.
Summary of Contents for EZ Track 4100
Page 1: ...EZ Track 4100 Training Procedure Manual...
Page 24: ...Auger Operation Procedure...
Page 36: ...Bucket Assembly Standard Operating Procedure Operating Procedure...
Page 40: ...Hydraulic Pole Guide Procedure Procedure...
Page 41: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...