background image

INST

ALL

A

TION 

MAN

UAL

 

4. Caution before installation 

Please read this instruction before installing PV module. 
 
1) The installation of PV module should be performed by qualified  personnel only. 
2)  When  installing  PV  module,  you  should  wear  protective  equipment.(electric 

shock or falling accident risk) 

3)  When  installing  PV  module,  do  not  step  up  onto  the  PV  module  or  place  the 

object on it. 

4) After installation, qualified person shall check whether it operates properly or not. 
5)  Disassembling  or  replacing  of  the  PV  module  part  is  not  allowed  without  

permission by manufacturer, and if you disassemble or replace anything, please 
inform the PV module manufacturer. 

6)  When  disassembling  or  replacing  the  part  with  manufacture’s  permission,  it 

should be performed by qualified person only, and use the certified accessories. 

7)  For  the  permission  or  regulation  for  installation,  please  contact  the  local 

authority. 

8)  When  the  PV  module  is  damaged  or  stopped,  anyone,  even  who  has  useful 

knowledge for the PV module, should not approach to the PV module. Touch or 
approach  may  cause  serious  injury,  in  which  case  manufacturer  is  not 
responsible for the damage therefrom. 

9)  PV  module’s  orientation  shall  be  at  equator  direction,  and  be  installed  at  the 

same angle as the latitude of the installation location for the optimal generation 
performance. If it is installed at a different angle or direction, it may adversely 
affect an annual generation capacity. In case of horizontal installation, S-Energy 
recommends regular cleaning to remove dust on the surface. 

10) PV module generates the voltage even without load connection. So, be careful 

for sparks especially when assembling/disassembling PV module.  

11) PV module is intended to be installed on the ground or building. 
       If  you  need  to  install  on  the  vehicle(car,  train,  etc.)  or  ship,  please  request 

special modules. 

12)  Snow,  water,  dust,  or  other  foreign  substance  on  the  surface  may  increase 

reflection  of  the  light  and  eventually  reduce  the  PV  module’s  output.(Regular 
cleaning of module surface can improve performance).  

13) Standard rating specification is measured at the STC AM1.5 condition, and the 

performance can significantly improve in the low temperature. 

14) Before installation, modules should be stored under packing condition. 
15) Irrespective of module connection, contacting current carrying part may cause 

a burn or fatal electrical shock from sparks. 

16)  The  shading  of  the  front  surface  of  the  module  can  cause  the  module 

degradation by fire or reduce its lifecycle. 

17)  When  working  with  the  PV  module  wire,  connect  the  wire  with  a  hanger  to 

avoid contact on the roof or ground. 

18)  Potential  Induced  Degradation  [PID]  may  be  caused  by  ambient  high 

temperature,  humidity,  and  high  system  voltage.  S-Energy’s  PV  module 
equipped with Enhanced  PID module can endure these degradation, but a long 
term exposure may also cause PID.  To completely prevent PID, trans inverter 
and Negative GND should be connected to the (-) GND with the module frame. 

5. Caution when installed 

1)  Please  make  sure  that  installed  module  wire  distribution  is  correct,  and 

insulation and waterproof performance of connect part is suitably installed.  

2)  Check  if  there  are  any  scratches  on  the  frame  and  front  surface  of  the 

glass(The scratch may lead oxidation and reduce the strength) 

3)   Regularly  clean  the  module  with  water,  and  if  the  module  is  not  cleaned 

with  water,  request  to  the  manufacturer.(*Regular  cleaning  can 
significantly improve the output capacity) 

4)   The front surface of glass is specially treated, so do not apply any abrasive 

cleaning product or chemicals. 

5)  Periodic  inspection  should  be  performed  only  by  qualified  personnel  with 

protective equipment. 

6)  To avoid shade by the vegetation environment, regular weeding is needed. 

Summary of Contents for SN245P-10

Page 1: ...INSTALLATION MANUAL INSTALLATION MANUAL PV Module Installation SN Model Version 1 0 2015 INSTALLATION MANUAL...

Page 2: ...and the actual installation use operation and maintenance should be performed by qualified personnel with electrical license 4 For the detailed quality warranty policy of the product please refer the...

Page 3: ...20 year s manufacturing technology and thorough quality management We S Energy Co Ltd will reward our customers by continuing to develop and produce good quality of product and consistently challenge...

Page 4: ...care is required for preventing corrosion contamination deterioration due to mishandling when you load outdoor load installation Store a module in an indoor warehouse before installing Always wear pr...

Page 5: ...ool on the module frame and surface Abrasion of the coated surface may lead to oxidize frames or reduce their strength The scratch of the surface may be the main cause of the module output degradation...

Page 6: ...tall on the vehicle car train etc or ship please request special modules 12 Snow water dust or other foreign substance on the surface may increase reflection of the light and eventually reduce the PV...

Page 7: ...d by S Energy and return it to S Energy for repair and replacement Material All the wire for the PV module connection should be configured with PV cable only Cable for PV double insulation UV resistan...

Page 8: ...on should be designed to satisfy the mechanical load of the site Operating temperature A ambient temperature of module installation site is limited by the minimum and maximum temperature as shown belo...

Page 9: ...the IEC61215 standard and S Energy Co Ltd recommends the following method of installing a frame hole As described in figure 1 an installation hole is inserted in the frame if the frame is randomly pro...

Page 10: ...245 W 250 W 255 W Short Circuit Current Isc 8 85 A 8 86 A 8 93 A Open Circuit Voltage Voc 37 3 V 37 3 V 37 6 V Module Effeciency 15 00 15 30 15 61 Operating module temperature Maximum System Voltage M...

Page 11: ...method is recommended by S Energy for the installation of the PV module on a roof in heavy snow regions Failure to remove accumulated snow on the PV module for long time may cause long term power redu...

Page 12: ...ion and method of clamp installation Module Clamp Assembly 3 Additional Grounding Methods Grounding lug Clamp installation location A position Confirm 7 mechanical installation module drawing Clamp wi...

Page 13: ...orn Germany Tel 49 6196 9540 111 3 Fax 49 6196 9985 778 E mail info europe s energy com SEAI America Inc dba S ENERGY America Address 18881 Von Karman Ave Suite 760 Irvine CA 92612 U S A Tel 1 949 281...

Reviews: